The Client
Loomis is a global leader in cash management with a presence in more than 20 countries. It is the UK’s premier cash management specialist, providing intelligent safes, cash in transit, cash collection, and cash processing solutions for retailers, banks and the public sector.
The Brief
Loomis required a lighting upgrade at its busy Dunstable facility while at the same time reducing energy costs and corporate environmental impact.
The quality of light at the company’s cassette warehouse in Dunstable was a challenge for staff, who were finding that it had a significant impact on their daily work. It was often difficult to clearly read information on the ATM cassettes they worked with.
Loomis commissioned SaveMoneyCutCarbon to assess the lighting and to propose sustainable options that delivered much improved lighting and reduced energy consumption as well as shrinking the facility’s carbon footprint.
As a company, Loomis is committed to policies that reduce energy and fuel consumption, while also improving waste management.
The Solution
SaveMoneyCutCarbon first carried out a comprehensive survey of the cassette warehouse to assess lighting levels and wiring before presenting management with options for LED upgrade.
To give the Loomis management team a clear idea of the proposed lighting, SaveMoneyCutCarbon presented 3D imagery to show the aesthetics of how it would look.
The team then created a detailed lighting design to ensure that the correct lux levels would be achieved. The levels for warehouse storage areas recommended by CIBSE is 100 lux, with 300 lux in the packing and despatch area – and these were fully met by the LED solution.
The SaveMoneyCutCarbon field services team fitted Philips Coreline Highbay 85W in the main warehouse area and Philips Coreline 4ft Battens 22W above each work bench. The Coreline Highbay is designed to replace HPI 250/400 W models while the Coreline batten easily replaces standard fluorescents.
LED technology was specified as it provides clear advantages over other options, with exceptional working life of 50,000 hours that ensures maintenance-free operation for many years as well as big savings on energy use.
Summary
- Annual savings of £4,122.
- Rapid payback – will repay investment in 2.03 years.
- Carbon emissions reduction of 71.7%
Annual Savings
-
4,122
£ saved
-
71%
tonnes
-
2.03
years payback